The scope of this project is to install new utility lines southeast of SMC Warehouse (TAN-1617).…
Bonneville Power Administration (BPA) proposes to exchange property with Kittitas Public Utility District (KPUD) and allow KPUD to construct a new …
Bonneville Power Administration (BPA) proposes to install jumpers between the Benton Rural Electric Association (BREA) substation tap line and stru…
The main objective of this project is to replace the existing East Interconnect. This change would replace the switch house enclosure, 12.47 kV swi…
Bonneville Power Administration (BPA) proposes to upgrade substation and telecommunications equipment at Salmon River Electric Cooperative, Inc.’s …
Upgrade aging electrical infrastructure in the B28 electrical vault to address clearance and arc flash issues, bring vault into code compliance wit…
Bonneville Power Administration (BPA) proposes to install a new series capacitor bank and associated switching and protective equipment at BPA’s Wa…
This revision covers expanded testing locations along the powerline.…
Bonneville Power Administration (BPA) proposes to replace an existing 230-kilovolt (kV) shunt capacitor group and associated switching and protective equipment at Longview Substation near Longview, Cowlitz County, Washington (Township 8 North, Range 3 East, Donation Land Claim 38).
Bonneville Power Administration (BPA) proposes to allow Northern Wasco County Public Utility District (NWCPUD) to install about 1,500 linear feet of new 230kV transmission line on BPA fee-owned property in Wasco County, Oregon.