Bonneville Power Administration (BPA) proposes to interconnect Columbia River Public Utilities District (CRPUD) newly constructed Deer Island subst…
Project includes the removal of all abandoned-in-place 161-kV equipment, structures, bus and foundations and construction of a new 69-kV switchyard…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform construction or modification of electric power substations or interco…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform deactivation, dismantling, and removal of electric transmission facil…
Rebuild 12.1 miles of 161kV transmission line 3005 from Liberty Substation to Van Buren Substation.…
The new rebuild will consist of conductor, OPGW, and overhead ground wire with associated hardware and rebuild.…
A new high-security, anti-scale and electrically grounded chain-link fence will replace the substation perimeter fence.…
A new 69 kV transmission line 4.0 miles long will be constructed from the existing Winlock substation (corner of SW Kerron St. and Hining Ave.) to …
The project will no longer be installing a septic system and will instead install a sewer line connecting to the existing sewage lagoons located no…
Bonneville Power Administration (BPA) proposes to create a loop from BPA’s Heyburn-Adelaide No.1 transmission line between existing structures 6/2 …