The purpose of the proposed action/project is to upgrade the utility systems identified below in the Proposed Action section.…
Upgrade the HAD system with newer technology and configure it to be controlled with a Windows-based system.…
WO 01690581 installs propane regulators and pressure gauges in 773-A, Lab B-154/158.…
WO 01662819 installs propane regulators and pressure gauges in 773-A, Lab B-138.…
A lower pressure loading capability is needed for Inert Loading Line 2.…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform safety and environmental improvements of a facility (including but not limit…
Temporary Modifications (Temp Mod) 264H-TMC-19-270 and 264H-TMC-19-271 utilize tubing, regulator, PSV, and associated fittings to provide a bypass …
MSA/HMIS to perform removal of Polychlorinated Biphenyl (PCB)-containing items (including, but not limited to, transformers and capacitors), PCB co…
Provide seismically qualified SC Fire Barrier between 233-H and 233-1H in room 40, 41, and 42.…
Several passive fire protection features in Building 233-H have deficiencies which could potentially degrade their performance in the event of a fi…