CH2M HILL Plateau Remediation Company (CHPRC) and its subcontractors perform safety and environmental improvements of a facility (including, but no…
The proposed work activity is to remove a recent modification from the Advanced Test Reactor (ATR) Control room air conditioner, 670-HVA-2. The mod…
Install Portable Heaters and Diesel Generators to Provide Temporary Heat For Y708 Project Tie-Ins…
The scope of the General Plant Project funded Knolls Laboratory Building Z10 Emergency Generator Installation Project includes the design and inst....
The scope of the Radioactive Materials Laboratory (RML) Ventilation System Replacement Project is to replace all the filter housings and ductwork curr
The Mission Support Contractor (MSC) and its subcontractors perform safety and environmental improvements of a facility (including, but not limited…
The purpose of this Environmental Checklist (EC) is to address activities at any Idaho National Laboratory (INL) facility, building or structure, e…
This revision captures changes to project scope. The proposed action no longer includes a new trench drain between buildings Test Area North (TAN)-…
This project includes replacement of the potable water pipes and fire water pipes on the 920 plateau. …
Remove Research Reactor Fuel Counter II (RRFC II) and associated equipment from 105-L Disassembly Basin.…