MT-SRT-2018-00003 has been created to replace the existing fire alarm panel and DACT in Building 786-A with a new panel (Notifier NFS-320) due to i…
      The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine maintenance activities at existing substations and swit…
      The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine maintenance activities at existing offices in five stat…
      The purpose of the proposed action/project is to upgrade the utility systems identified below in the Proposed Action section.…
      Upgrade the HAD system with newer technology and configure it to be controlled with a Windows-based system.…
      WO 01690581 installs propane regulators and pressure gauges in 773-A, Lab B-154/158.…
      WO 01662819 installs propane regulators and pressure gauges in 773-A, Lab B-138.…
      A lower pressure loading capability is needed for Inert Loading Line 2.…
      Central Plateau Cleanup Company (CPCCo) and its subcontractors perform safety and environmental improvements of a facility (including but not limit…
      Temporary Modifications (Temp Mod) 264H-TMC-19-270 and 264H-TMC-19-271 utilize tubing, regulator, PSV, and associated fittings to provide a bypass …
       
        