MSA/HMIS to perform removal of Polychlorinated Biphenyl (PCB)-containing items (including, but not limited to, transformers and capacitors), PCB co…
      Provide seismically qualified SC Fire Barrier between 233-H and 233-1H in room 40, 41, and 42.…
      Several passive fire protection features in Building 233-H have deficiencies which could potentially degrade their performance in the event of a fi…
      Electrical load consolidation from Motor Control Center (MCC) MCC-32M1 to MCC-38M1.…
      Cleanbox system to be utilized in cleaning headsets and AR/VR peripherals through UVC light to destroy viruses and bacteria including MRSA, SARS-Co…
      Install a permanent ventilation system for the Sodium Nitrite Makeup Tank (SNMUT) to allow tank to vent directly to the atmosphere at the 422-S roo…
      Pennsylvania State University proposes to study fundamental characteristics of molten fluoride salts in order to develop a thermodynamic model of t…
      Bonneville Power Administration (BPA) proposes to conduct activities as the need arises to improve workplace comfort or safety, security systems, a…
      Site Utilities and Facility Operations (SUFO) are in need of a turn-around area on the north side of U.S. Highway 20 near the INL puzzle. …
      The scope of work is to repair the ZPPR North Tunnel, restoring its strutural integrity to support continued operation…
       
        