Remove and replace fire dampers FD-292-104 and FD-292-115 and their associated penetration seals in Building 292-S.…
      National Nuclear Security Administration (NNSA)’s proposed action is to 1) create temporary housing for occupancy 2) provide non-occupancy space fo…
      National Nuclear Security Administration’s proposed action is to perform the necessary and routine analytical laboratory operation, research and de…
      National Nuclear Security Administration’s (NNSA) proposed action is to perform the necessary and routine personnel safety enhancements and safety …
      Bonneville Power Administration (BPA) proposes to replace the automatic vehicle entry gate at the Chemawa Maintenance Headquarters because the exis…
      Air gap building propane system to Section C Lab Modules per M-DCF-A-01420 and WO 01891511.…
      Remove the south rail stop from the 105-L transfer bay area.…
      The Saltstone Dust Collectors are to be equipped with pressure relief protection.…
      Upgrade the communications/server room with clean fire suppressant system,HVAC units, fire and HVAC controls,and raise floor for fire suppressant s…
      Upgrade the communications/server room with clean fire suppressant system, HVAC units, fire and HVAC controls, and raise floor for fire suppressant…
       
        