The installation of a new guardrail system will provide fall protection from the edge of the roof for workers in the area or those passing by.…
The power feed to MFC-724/721 is provided from 3 50KVA pole mounted transformers by Harrison Blvd. Project plans on removing the pole mounted trans…
Disassemble and remove sections of nitrogen piping line NNG509 and install piping blinds.…
Propane supplied from the Flammable Gas Distribution System (FGDS) is no longer required throughout the facility and is only required for operation…
This project would replace identified equipment within the existing Building 12-123 Complex Compressed Air System with new equipment to meet the co…
Temporary rectifier is to be replaced with a permanent smaller rectifier for the S-Area Diesel Fuel Oil Underground Storage Tank and Underground Pi…
Two metal panels cover part of an expansion joint in the 105-L Disassembly Basin, in the Dry Cave portion of the basin area. These metal panelsare …
Incorporates an additional Temporary Modification to add piping to direct the SDU 6 East Sump contents back into SDU 6.…
Bonneville Power Administration (BPA) proposes to install a temporary, vehicle barrier near the Mount Hebo communications site. Before the 7-foot-l…
The final project is an expansion of the existing flood storage by excavation with the area already under an easement to the City of Batavia for st…