Work required to install a 38kW backup generator and 1,000 gallon underground fuel tank along with the necessary electrical wiring and equipment to…
A crack/hole in the 216-C Sump wall at the -40 level will be sealed. There is an ongoing leak from this location at this time.…
Propane supplied from the Flammable Gas Distribution System (FGDS) is no longer required throughout the facility and is only required for operation…
Remove water fountain and associated water filter from 247-H. Replace the water fountain with a bottle filling-water fountain combination.…
Shielding is to be installed around the Trim Cooler Fan Console Boxes to protect the operators when trying to access them.…
Install an additional check valve on the outlet of each primary purge compressor for the Chemical Process Cell (CPC) systems.…
The installation of a new guardrail system will provide fall protection from the edge of the roof for workers in the area or those passing by.…
The power feed to MFC-724/721 is provided from 3 50KVA pole mounted transformers by Harrison Blvd. Project plans on removing the pole mounted trans…
Disassemble and remove sections of nitrogen piping line NNG509 and install piping blinds.…
Propane supplied from the Flammable Gas Distribution System (FGDS) is no longer required throughout the facility and is only required for operation…