The Bonneville Power Administration (BPA) proposes to enter into a land use agreement (LURR) with Harold Sorensen Trucking (HST) to construct an em…
Maintenance, repairs, renovations, and upkeep will focus on these systems: plumbing, building envelope, electrical, telecommunication, and research…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform safety and environmental improvements of a facility (including but not limit…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform safety and environmental improvements of a facility (including, but n…
Work required to install a 38kW backup generator and 1,000 gallon underground fuel tank along with the necessary electrical wiring and equipment to…
A crack/hole in the 216-C Sump wall at the -40 level will be sealed. There is an ongoing leak from this location at this time.…
Propane supplied from the Flammable Gas Distribution System (FGDS) is no longer required throughout the facility and is only required for operation…
Remove water fountain and associated water filter from 247-H. Replace the water fountain with a bottle filling-water fountain combination.…
Shielding is to be installed around the Trim Cooler Fan Console Boxes to protect the operators when trying to access them.…
Install an additional check valve on the outlet of each primary purge compressor for the Chemical Process Cell (CPC) systems.…