The scope of work includes reconfiguring the space for the new use, upgrading the HVAC system, the electrical, lighting systems, and the telecommunication system.
The scope of this effort includes installation of a new generator, the associated support systems required for operation (cooling, lube oil, fuel, …
Revision 4: Additional scope of approximately 930 LF of 6" diameter Fire Water line and 4 new Fire Hydrants, tied into existing Fire Water system. …
The Breathing Air filters that are in the H-Canyon Warm Gang Valve Corridor no longer have filter elements available commercially. The filter housi…
The U.S. Department of Energy (DOE) is proposing to administer congressionally directed spending to the Narragansett Bay Commission (NBC) to rehabi…
Kansas City National Security Campus (KCNSC), KCNSC23-03, Project 16069, Remediate OA issues in 2.K101.…
LM is proposing to conduct administrative actions, routine operations, and maintenance activities at the Tuba City, Arizona, Disposal Site.…
This scope covered the ground preparation, creation, construction, and installation of the sign (See Figure 2 and 3 for approximate location). It a…
Establish a set of streetlights at the intersections of Lincoln Road/INTEC entrance, and at the Lincoln Road/NRF "Y" that will provide sufficient i…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…