This project would replace identified equipment within the existing Building 12-123 Complex Compressed Air System with new equipment to meet the co…
Temporary rectifier is to be replaced with a permanent smaller rectifier for the S-Area Diesel Fuel Oil Underground Storage Tank and Underground Pi…
Two metal panels cover part of an expansion joint in the 105-L Disassembly Basin, in the Dry Cave portion of the basin area. These metal panelsare …
Incorporates an additional Temporary Modification to add piping to direct the SDU 6 East Sump contents back into SDU 6.…
Bonneville Power Administration (BPA) proposes to install a temporary, vehicle barrier near the Mount Hebo communications site. Before the 7-foot-l…
The final project is an expansion of the existing flood storage by excavation with the area already under an easement to the City of Batavia for st…
This proposed project will modify the plant protective system (PPS) in Advanced Test Reactor (ATR) to allow operation of lobe powers from 60 MW up …
The US Department of Energy (DOE) proposes to perform mechanical replacements and/or upgrades of the Advanced Light Source (ALS) switchstation A3 (…
Isolation of the Confinement Heat Removal (CHR) System from the disassembly basin in K-Area. Revision 1 only to extend activity end date.…