Remove water fountain and associated water filter from 247-H. Replace the water fountain with a bottle filling / water fountain combination.…
The scope of the Naval Reactors Facility (NRF) Control System Upgrades/Modifications to the Cask Shipping and Receiving Facility (CSRF) to Support the Buffering of M-290 Shipping Containers with A1G Spent Nuclear Fuel Assemblies Project covers temporary control system upgrades and modifications at the CSRF so the facility can operate as a radiological facility to support unloading A1G spent nuclear fuel assemblies from M290 shipping containers, and repackaging of the fuel assemblies into canisters and protective overpacks for temporary storage (i.e., buffering) until the fuel assemblies can be processed at a later date in the Naval Spent Fuel Handling Facility.
Retrofit metal floor platform in 776-2A with pre-fab platform.…
Protective Bollards Installation at 715-K Fuel Station…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform safety and environmental improvements of a facility (including, but n…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform safety and environmental improvements of a facility (including but not limit…
Vacuuming "Cobweb" Growth from L-Area Vertical Tube Storage Racks…
The proposed action involves management of forests on-site at Brookhaven National Laboratory in Upton, New York.…
The purpose of the proposed project is to replace the existing underground storage tanks (USTs) and fuel dispensers at Building (B) 611 with new aboveground storage tanks (ASTs) and fuel dispensers.
As part of the ATR electrical system upgrades, the 670 -M-42 and M-43 Diesel Generators (50 yrs old) are to be replaced and relocated to the area…