Incorporates an additional Temporary Modification to add piping to direct the SDU 6 East Sump contents back into SDU 6.…
Bonneville Power Administration (BPA) proposes to install a temporary, vehicle barrier near the Mount Hebo communications site. Before the 7-foot-l…
The final project is an expansion of the existing flood storage by excavation with the area already under an easement to the City of Batavia for st…
This proposed project will modify the plant protective system (PPS) in Advanced Test Reactor (ATR) to allow operation of lobe powers from 60 MW up …
The US Department of Energy (DOE) proposes to perform mechanical replacements and/or upgrades of the Advanced Light Source (ALS) switchstation A3 (…
Isolation of the Confinement Heat Removal (CHR) System from the disassembly basin in K-Area. Revision 1 only to extend activity end date.…
This modification will install a security barrier at Building 105-K air handling unit's duct penetration point.…
Bonneville Power Administration (BPA) proposes to fund electrical grounding installations along three parallel underground Seattle Public Utilities…
Conduct routine inspections, monitoring, and maintenance activities throughout the year at the Sherwood, WA, Disposal Site based on best management…