New changes to Boiler Maximum Achievable Control Technology (BMACT) EPA rules reduce the amount of particulates emitted from source stacks. This pr…
The proposed action permanently closes seven regulated Underground Storage Tanks (UST) and one non-regulated UST at the Central Facilities Area (CF…
Battelle Energy Alliance, LLC (BEA) is the current management and operating Contractor for the Idaho National Laboratory (INL). As part of its cont…
The settler tank area outside the Material Access Center outside 105-L has a needed corrective action. A pipe needs a threaded cap on the drainage …
There are four heat exchangers on the roof of 105-K that are no longer in use. The facility has been asked to remove these along with surrounding i…
Install a pressure reducing valve in both Inert Load Lines in accessible locations that allow the operator to monitor delivery gas pressure and loa…
Removal of wood bridge from 294-1F.…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform safety and environmental improvements of a facility (including, but n…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform safety and environmental improvements of facility (including but not limited…
The Health Protection Programmable Logic Controller (HP-PLC) (controller, main frame) monitors and controls the H Area New Manufacturing (HANM) Air…