BEA is planning to replace an existing subsurface sewage disposal (septic) system with a new subsurface sewage disposal system (3,000-gal septic ta…
Office of NEPA Policy and Compliance
August 12, 2024BEA is planning to replace an existing subsurface sewage disposal (septic) system with a new subsurface sewage disposal system (3,000-gal septic tank, dosing chamber, pumps, drain field, replacement drain field, etc.) located across the road (Harrison Boulevard) to the southwest of Transient Reactor Test (TREAT) Facility buildings MFC-721 and -724.