All low-level radioactive liquid waste, i.e., warm waste water at Advanced Test Reactor, ATR, Complex is transferred to the ATR Evaporation Pond, T…
The acetylene service is being air gapped and capped out in 773-2A in order to comply with new calculations for flammability and explosives ...…
Improve the access and egress of heavy truck traffic on and off the BC Site at the South Gate.…
Pour two concrete pads near 794-A, and install platforms to allow gauge readings at the fuel tank to be safely taken and to allow safe access the s…
Install Portable Heaters and Diesel Generators to Provide Temporary Heat For Y708 Project Tie-Ins…
Replace Metal Halide lighting with LEDs inside Building 236-3F, WSB.…
Upgrade 254-5H Diesel Fuel Level and Leak Detection System with a Pneumercator Level and Leak Detection System.…
Install Overfill Prevention Device on the Underground Storage Tank at 703-6B Heliopad.…
The Princeton Plasma Physics Laboratory's (PPPL) proposed Critical InfrastructureRecovery and Renewal (CIRR) project would replace old, degraded sy…
Bonneville Power Administration (BPA) proposes to perform vegetation management on BPA-owned land on approximately 150 acres of land surrounding Be…