CX-026461: Evaluate and Remove Metal Panels Covering the Expansion Joint in Dry Cave Portion of the 105-L Disassembly Basin

Two metal panels cover part of an expansion joint in the 105-L Disassembly Basin, in the Dry Cave portion of the basin area. These metal panelsare …

Office of NEPA Policy and Compliance

July 6, 2022
minute read time

Two metal panels cover part of an expansion joint in the 105-L Disassembly Basin, in the Dry Cave portion of the basin area. These metal panelsare coming loose and are in danger of falling. The planned work activity will be to evaluate hardware in the attached to the ceiling and to removethese panels.