Well management activities include decommissioning (abandonment) of inactive wells and injection wells at the Idaho National Laboratory Site. The w…
The Bonneville Power Administration is proposing to remedy three impairments along the Potholes-Grand Coulee No. 1 Transmission Line within Bonnevi…
Bonneville Power Administration has identified a transmission line clearance impairment on the Cascade Steel Tap to Carlton-Sherwood #1 transmissio…
Remove and re-install insulation housing from secondary chill water pump 006 at Building 785-6A. The asbestos inspection report found insulation to…
Excavate and repair underground Service Water link near Building 784-A. Leak is due to normal wear and tear. Replacement materials will be like-for…
Replace packing in Deepwell Pump 905-108H. Treat packing/gaskets as asbesto…
This proposed activity will install a tie-in connection for an alternate diesel generator in the event of extensive repair time for the permanent i…
Paint and seal exterior of Building 722-5A. Scope also includes repairing stucco, installing aluminum plates at foundation, replacement of caulking…
Repair bypass line on Deepwell 905-53A. Pipe is cracked. Welding is required and a weld map is needed. Also repair V-007 broken valve handle.…
Paint and seal exterior of Building 720-2A. Scope also includes repairing stucco, caulking, and prepping the stucco for painting. Paint interior an…