Bonneville Power Administration (BPA) proposes to repair the metal roof and an exterior vent on the equipment building at the Metaline Radio Statio…
Office of NEPA Policy and Compliance
July 23, 2019Bonneville Power Administration (BPA) proposes to repair the metal roof and an exterior vent on the equipment building at the Metaline Radio Station. The building was damaged by snow and ice during the winter of 2018/2019. Flashing and sealant would be used to ensure that the repaired roof is water-tight. The work is expected last for approximately two weeks.