Bonneville Power Administration (BPA) is proposing to improve access roads along the Alston-Driscoll No. 2 Transmission Line. The proposed project …
Install metal/cork strips around Room 76 in Building 707-F.…
McQuay Chiller #1 is an air-cooled unit which requires periodic coil cleaning. The Site Stormwater SME has received approval from SCDHEC for relea…
Bonneville Power Administration (BPA) is proposing to remedy six impairments to the Keeler-Forest Grove No. 2 transmission line in six separate loc…
Evaluate and repair crane solenoid and breaker that is intermittently tripping on low lift crane at 681-3G.…
Subcontractor shall furnish all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision necessary to re…
Remove presumed asbestos containing material (PACM) gaskets from flanges and conduct maintenance on relief valve PSV-012 (Pressure Safety Valve).…
Install sidewalk and replace damaged stairs at Building 226-2F.…
The existing pedestrian walkway in front of the Covington Untanking Tower would be replaced due to some cracks causing safety hazards. The entire 1…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct site restoration along its Beaver Creek-Deering Lake (BC…