Removal and replacement of cracked sidewalks throughout MGN site and sealing of joints on upper level of parking garage. Approximate estimate for c…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), completed an emergency jumper replacement on Structure 4/2 of the Miracle Mi…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), completed an emergency relocation of Structure 39/3 on the Flaming Gorge-Ver…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Estes-Pole Hill …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace Structures 2/3 and 2/8 on its Kortes-Miracle Mile (K-MM)…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to conduct routine vegetation management along its Estes-Pole Hill (…
Correct/recoat phosphate chemical dike at 782-3A.…
Inspection and Treatment of utility/power poles in the H Area (Canyon, HTF, General, ETF) and S/Z/J areas.…
Perform cleaning, seal coating, and restriping of 717-K NW Parking Lot.…
The Bonneville Power Administration (BPA) is proposing to remedy three impairments along the Grand Ronde-Boyer transmission line located in Polk Co…