Remove two presumed asbestos containing material (PACM) gaskets from Recovery Well 8 to allow for routine maintenance.…
607-70G Remove insulation from process water line in Ditch 1.…
Remove, replace, reinstall MST-TRP-001 (steam trap) associated piping, insulation (non-asbestos), and potentially asbestos containing material (PAC…
This proposed activity will remove additional insulation from the 150 pound steam to trap to allow for leak repairs.…
This proposed activity will regasket a drop jumper in the Canyon Building. The gasket is assumed to be asbestos containing material.…
Boiler preventive and corrective maintenance (PM/CM) on 735-1B Hot Water System, including removal of presumed asbestos containing material (PACM) …
The existing cubicles are original to the 730-B facility and have reached the end of their design life and will be replaced.…
Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
Remove insulation from valve 806, so that packing can be adjusted. Valve is located in front of 736-A, SRNL.…
Replace wooden steam line support brackets with steel brackets in various locations in A-Area.…