The Bonneville Power Administration (BPA) proposes to correct two areas along the St. Clair-South Tacoma transmission line where the ground to cond…
C. E. Bourne Subcontractor 00000611 will provide assembly and disassembly roof repairs at Building 105-L.…
Repaint and black out sections of parking lot.…
Overhaul the diesel driven fire water pump at Building 901-Z due to normal wear and tear. Gaskets and packing material to be handled as potential a…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. The approximate width of the riprap addition i…
Perform repairs to Building 719-5N.…
772-F domestic water outlet isolation valve is leaking. In order to repair domestic water line near regulator, the presumed asbestos containing mat…
Remove PACM gasket for hoist motor and repair emergency gate hoist 001 at L-Lake dam.…
This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
BPA is proposing to conduct inspection & repair of transmission tower steel lattice legs and concrete footings at transmission structures of the Ch…