Replace bearings for on chilled water pump at 235-2F. The presumed asbestos containing material (PACM) gasket material at the flanges will be remov…
Remove one Presumed Asbestos Containing Material (PACM) gasket from ABRP well AHT-14. Removal of gasket will allow for maintenance to repair broke…
Replace or repair targeted exterior doors for several buildings at the NETL Morgantown site that are currently in poor condition. …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace two 34.5 kV oil circuit breakers (OCB) and associated eq…
Excavate to replace the defective domestic water valve DW-V-40 in H Area near 284-19H. Valve has failed between open and closed. …
Replace bearings for on chilled water at 285-11F. The presumed asbestos containing material (PACM) gasket material at the flanges will be removed.…
Excavate to correct the domestic water supply line leak at MOX Concrete Batch Plant.…
Replace the tile flooring in the 701-1K Vestibule.…
Subcontractor will provide assembly and disassembly roof repairs at Building 105-L. The subcontractor "will not" disturb the existing roof while p…
The planned work scope is for the removal of floor tile and mastic known to contain asbestos in Room 54 of Building 713-N. Dispose of asbestos con…