Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its North GunnisonSa…
BPA proposes to replace deteriorating wood poles and associated structural/electrical components (e.g., cross arms, insulators, guy anchors, etc.)…
The Bonneville Power Administration (BPA) is proposing to replace cross-arms on 13 wood pole structures along the Grand Coulee-Okanagan No. 2 trans…
This activity will modify the chemical feed system and associated concrete containment structures at the 789-B domestic water treatment plant. Rev…
Replace the outboard bearing packing on Pump 004 at 681-3G Pump House.…
Corrective maintenance activity is required on the 607-46G lift station in order for it to work properly.…
The motor and pump for domestic water deep well 905-113G need to be replaced/rebuilt due to degradation from continuous operation.…
Subcontractor will provide roof replacement at Building 251-F. The Subcontractor “will ” disturb the existing roof while performing this replacemen…
Subcontractor will provide roof repairs at Building 763-52N. The Subcontractor will disturb the existing roof while performing these repairs on Bui…
Subcontractor will provide roof replacement at Building 717-K. The Subcontractor will disturb the existing roof while performing this replacement o…