The Western Area Power Administration (WAPA) is proposing to replace broken/malfunctioning insulators on the Mead - Perkins (MED-PES) 500-kV transm…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to conduct routine vegetation management along its Poudre-Timnath (P…
Subcontractor shall furnish all engineering, materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services req…
The Western Area Power Administration (WAPA) is proposing to reduce incompatible vegetation and fuel loading within the Right-of-Way (ROW) along th…
Inspection and/or treatment of currently installed utility poles in E Burial Ground area…
This activity is to evaluate and correct lighting fixtures throughout various buildings in F-Area.…
241-280H Replace Manway on Tanks 01 & 02 and remove existing gaskets.…
Removal and proper disposal of 2 fume hoods located in Room 112 of building B25. The fume hoods have asbestos containing panels. …
This activity is to evaluate and correct lighting fixtures throughout Building 706-4F.…
Remove all coatings down to the original concrete floor in Room 16 of Bldg. 705-N.…