Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
Construction will remove asbestos insulation and replace with non-asbestos insulation.…
Perform cleaning, seal coating, and restriping of parking lots in C-Area (613-C, 613-1C, 613-2C). …
Subcontractor will provide roof repairs on Building 618-G. The Subcontractor will not disturb the existing roof while performing these repairs on B…
Proposed activity is to dig 12 inches deep by approximately 12 inches in length and width beside the 285-H basin wall at the construction joint tha…
The River Water Pumphouse, 681-3G, utilizes an outdoor 8-ton gantry crane with local and remote pendent controls. The control panel was last replac…
Subcontractor will provide roof repairs at Trailer 225-28H. The Subcontractor will disturb the existing roof while performing these repairs on Trai…
Subcontractor will provide roof repairs at Building 264-6H. The Subcontractor will not disturb the existing roof while performing these repairs on …
Subcontractor will provide roof repairs at Building 905-87H. The Subcontractor will not disturb the existing roof while performing these repairs on…
Beautification of Room 1021 with painting, new carpet, doors, etc.…