Welding repairs on Steam Lines.…
Subcontractor will provide roof repairs to Building 717-2B. The Subcontractor will not disturb the existing roof while performing these repairs on …
BPA proposes to perform routine maintenance along the access roads and structure spur roads of the Paul-Olympia No. 1 transmission line, between st…
Remove PACM gasket for hoist motor and repair emergency gate hoist 001 at L-Lake dam.…
Fabricate and install an aluminum cover over existing well northwest of Trailer 247-19F.…
Construction will take an asbestos sample from electrical enclosures in the 4th Level Control and Hot Gang Valve Corridor…
BPA proposes to replace deteriorating and failing concrete foundations and install additional footings at Sycan Compensation Station No. 1 to ensur…
Remove receptacles and non-load bearing wall between Rooms10 &11 in Building 773-63A.…
Overhaul pump EFP #1 at 902-5B.…
Remove and reinstall insulation from Service Water (SW) Pump 003 so that check valve can be replaced.…