October 4, 2019BPA proposes to perform routine maintenance along the access roads and structure spur roads of the Paul-Olympia No. 1 transmission line, between structures 4/1 to 5/3 and 12/4 to 12/5. To maintain access to existing towers and transmission lines, BPA is proposing to add one cross-drain culvert; clean two existing culverts; add four ditch reliefs, six drain dips, and five waterbars; perform minor blading, shaping, grading, and adding rock (improvements) to approximately 7,850 feet of existing serviceable access and structure spur roads; reconstruct approximately 275 feet of road; and clear and grub 275 feet of road. General equipment used for this type of project includes mowers, graders, rollers, excavators, and dump trucks.