Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to install a new culvert on the existing access road for the Buffal…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
Activities addressed by this standard NEPA Review Form include: Routine maintenance and repair activities, Plant rearrangements and/or building mo…
Doors around the Advanced Test Reactor (ATR) Complex need to be replaced due to old age and degradation. The purpose of the proposed action is to r…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to hire a contractor to design and install a fully redundant Heatin…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to remove windblown sand that has accumulated under Structures 159/…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to remove windblown sand that has accumulated under Structures 118/…
Bonneville Power Administration (BPA) proposes to excavate and regrade a mounded earthen impairment to the Sand Creek-Bonners Ferry No. 1 transmiss…
The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is proposing to perform road erosion repair work at the L-Bar, New Mexico, Dis…
The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is proposing to perform road erosion repair work at the Bluewater, New Mexico,…