The chilled water supply to the breathing air compressor (No. 2) after-cooler/moisture separator has a developed a leak in the ceiling adjacent to …
Replace positive crankcase ventilation 001 outlet isolation valves A1-901-SW-V-428 & A1-901-SW-V-429 at 901-A. Valves are leaking. Gaskets will be…
Remove suspect asbestos gaskets on discharge line at 905-103F.…
Replace existing sidewalk on the north side of Buildings 7-11.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing wooden H-frame structures along its Box Butte S…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine maintenance of the existing access roads along a…
This Categorical Exclusion covers routine renovation and maintenance activities of a general and repetitive nature which include installation, modi…
Subcontractor shall provide required security, safety, administrative, managerial, operational, and logistical services for the SPR from 2019-2024.…
Subcontractor shall provide all labor, tools, equipment, transportation and supervision, as required to cut trees, brush and grass from approximate…
The proposed action decontaminates six experiment loop piping systems and the canal recycle system of the Advanced Test Reactor, TRA-670. The loop …