BPA proposes to replace non-ceramic insulators (NCIs) with ceramic insulators on sections of the Eugene-Alderwood, Albany-Eugene, Parker Tap, and J…
Troubleshoot and repair Heating Water Circulating Pump #006 in Building 735-1B.…
Wash/clean, caulk, and repaint Trailer 704-74F.…
A leak has occurred on the piping of the Neutralization System at 723-A. The piping and Pump-001 will be replaced. Gaskets at flanges are PACM (Pre…
Removal of possible asbestos gasket from Pressure Safety Valves (PSV) PSV6013/PSV6014/PSV6016/PSV146 at 717-F Construction Bay Low Pressure Piping …
Painting the exterior of Building 701-1L.…
Replace Valve SCW-V-4501 at K-Area Assembly Area and associated insulation.…
LM is proposing to install fence flagging as a wildlife habitat improvement at the Gunnison site. The proposed action is intended to enhance wildli…
The Western Area Power Administration (WAPA) is proposing to replace insulators at Structures 92/1 - 92/3 on the Glen Canyon (GC) - Flagstaff (FLG)…
Removal of presumed asbestos containing material (PACM) gaskets to replace plastic relief valve (PSV 002) for Phosphate pump 002 located inside 789…