This revision adds scope to revision 1 of the environmental checklist (EC). Power Management has identified additional power poles that need to be …
The subcontractor shall supply all labor, materials, equipment, supervision and required insurance to non-selectively perform vegetation control at…
The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, labor, supervision, and services required to perform the…
Subcontractor shall provide all personnel, equipment, materials, tools, and transportation required to perform wireline services for the SPR sites …
The Bonneville Power Administration (BPA) is proposing to improve an access road along the Marion-Alvey No. 1 Transmission Line within BPA’s Alvey …
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys at the below …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Ault-Craig (AU-C…
Install a new code and ADA compliant sidewalk on the North Side of Building 1. …
Repair deck and stairs at Trailer 254-12F.…
Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…