BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace one 115-kV oil circuit breaker (OCB) and associated equi…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management within the right-of-way (R…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace one 12.47-kV oil circuit breaker (OCB) and associated eq…
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys at the above …
DOE LM is proposing to install aerial survey quality control monuments for future aerial survey activities at the Shirley Basin South, disposal sit…
Prep and paint pump skid at Waste Solidification Building (WSB).…
Bonneville Power Administration (BPA) is proposing to resurface the bridge crossing of Butte Creek, which leads to BPA’s Raymond Substation. The br…
SUD to paint various equipment sitewide. Scopes include cleaning, prepping and painting. …
SUD/Construction to paint air release valves on the river water system. Scopes include cleaning, prepping, and painting.…