This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O&M Plan is required. These excavati…
Upgrade lighting to LED as current bulbs expire.…
Construction will remove and replace the bent gutter on North Side of Low Activity Waste Vault (LAWV).…
Subcontractor shall provide all supervision, transportation, labor, materials and equipment to locate, excavate, and inspect an internal corrosion …
BPA proposes to replace non-ceramic insulators (NCIs) with ceramic insulators on sections of the Eugene-Alderwood, Albany-Eugene, Parker Tap, and J…
Vendor to clean Nurse Tanker SRO# 0148.…
Valve FE-2301 (H-264002-EXTR-HV-138) will be replaced with a like-for-like valve; however, the new valve will have an additional functionality of a ma
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 0/9, 11/2, 12/8, 19/5, and 23/7 on i…
The DCF will update a TCVG indicator from an obsolete model number to a new model supported by the vendor (Teledyne Hastings Instruments). The pre…
Removal of suspect asbestos gaskets from valves in Building 703-A to facilate replacement of relief valves, steam traps, and/or other valves associ…