Install additional receptacles and paint in Room 135 of Building 730-2B.…
Steam line insulation removal to identify and fixed leak upstream of Valve PSS-V-7703.…
DOE LM is proposing to install aerial survey monuments for future aerial survey activities at the Edgemont disposal site. Monuments would be constr…
DOE LM is proposing to install aerial survey monuments for future aerial survey activities at the Spook disposal site. Aerial survey control monume…
The Bonneville Power Administration (BPA) proposes to replace 17 deteriorating wood poles and associated structural/electrical components (e.g. cro…
The Bonneville Power Administration (BPA) proposes to repair damaged goat peaks on structures 61/3, 61/4, 61/5 along the Schultz-Raver No. 1 500 kV…
The purpose of this overarching EC is to address activities through FY 2020 that would meet the intent of the Categorical Exclusion (CX) B1.3 as de…
Remove and replace the defective seal on the #5 Cone Valve at the 681-3G Pump House. Seal is suspect asbestos.…
BPA proposes to replace deteriorating wood-pole structures (including, cross arms, insulators, guy anchors, etc.) along the specified line. Replace…
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys at the below …