Install new 480V service at ATTA Range 7.…
This activity will replace the existing 152-K transformer with a pole mounted transformer, and leave the 152-K transformer abandoned in place.…
Activity will install new steam line support poles to replace defective steam line support poles H-47 and H-48.…
Subcontractor shall furnish all tools, equipment, transportation, labor, and supervision, required to perform the work in connection with the blast…
The subcontractor shall supply all labor, materials, pesticides, transportation and supervision necessary to perform monthly Degas pest control ser…
To perform monthly Degas pest control services at the West Hackberry Strategic Petroleum Reserve facility.
Western Area Power Administration (WAPA), Rocky MountainRegion, proposes to replace ninety-six existing wooden H-frame structures along its Will…
Replace the existing fluorescent light fixtures with LED fixtures in Building 719-H.…
The Western Area Power Administration (WAPA), Sierra Nevada Region (SNR), is proposing to remove up to 421 hazard trees within and adjacent to the …
The existing No. 3 water heater unit and boiler at 735-1B is leaking and has failed due to normal wear and age.…