Valve and presumed asbestos containing material (PACM) gasket removal and replacement at H Base Injection.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct “danger tree” management along its Gore Pass-Hayden (GOT…
Replace Temperature Valve in AHU #5 & #6 with insulation/gasket removal and replacement as necessary.…
Building 233-H P-Evac Hydride Bed Replacement…
Construction will remove and replace the bent gutter on North Side of Low Activity Waste Vault (LAWV).…
Upgrade lighting to LED as current bulbs expire.…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O&M Plan is required. These excavati…
Subcontractor shall provide all supervision, transportation, labor, materials and equipment to locate, excavate, and inspect an internal corrosion …
BPA proposes to replace non-ceramic insulators (NCIs) with ceramic insulators on sections of the Eugene-Alderwood, Albany-Eugene, Parker Tap, and J…
Vendor to clean Nurse Tanker SRO# 0148.…