Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing Structures 0/5 and 5/7 on its Flatiron to Dixon …
Remove existing guardrails and ladder on 234-H. Install an aluminum ladder that meets OSHA and NFPA 101 requirements.…
Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electricalre…
Subcontractor will provide roof repairs at Building 703-10B.…
Remove portions of existing guardrails, conduit, and conduit support, and remove ladder on 249-H.…
Subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to perf…
The purpose of this revision is to address snow removal, specifically using a grader (patrol), on the road that connects the Obsidian Test Pad to t…
Remove receptacles and non-load-bearing wall, repaint walls, and replace carpet and baseboards in Building 773-63A, Rooms 10 and 11.…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is not required.…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. …