Award Number: DE-AC36-08GO28308, CX(s) Applied: B1.3, B1.15, NREL, Location(s): CO, Office(s): Golden Field Office
Bonneville Power Administration (BPA) proposes to fund operation and maintenance activities within Oregon Department of Fish and Wildlife’s (ODFW) …
Bonneville Power Administration (BPA) proposes to fund operation and maintenance activities within Oregon Department of Fish and Wildlife’s (ODFW) …
Bonneville Power Administration (BPA) proposes to remove and replace marker balls on nine transmission lines in Oregon, Washington, Idaho, and Mont…
The roof at EBR-1 sections 2, 3, 4 and the guard house (figure 1) have reached the end of their useful life. Preventative maintenance is required t…
Road E (2.5 miles) will be milled 2-1/2 inches, paved with 1 inch Open Graded Interlayer (OGI) and 2 inches of asphalt, striped with thermoplastic …
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3000 to rebuild GB recirculation blowers.…
Road 4 (2.8 miles) will be milled 2-1/2 inches, paved with 1 inch Open Graded Interlayer (OGI) and 2 inches of asphalt, striped with thermoplastic …
Bonneville Power Administration (BPA) proposes to remove a 7-foot-tall chain-link fence surrounding the Bell Substation and Maintenance Headquarter…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…