Replace floor tile in building 713-1N, Section A1, Corridor No. 2 hallway between offices N321 and N204.…
Install a hands free water dispenser in the lobby of 730-2B.…
Proposed activity is to dig beside the 285-H basin wall at the construction joint that is leaking and complete repair.…
Repair and replace failed septic system at 709-7G.…
Replace front entrance door and frame at 705-C.…
766-H Repair sheetrock, install missing cove base.…
Fabricating and placing a new structural steel platform 18 inches above the existing structural steel platforms that access the 4-valve manifold.
LM is proposing to conduct a pilot study on the low-permeability rock-armored earthen cover of the disposal cell at the LMGrand Junction, Colorado,…
The scope of the Knolls Laboratory Outfall 005 Maintenance and Repair Project willinclude the removal of sediment that has accumulated directly upstr…
This proposed activity will replace damaged floor tile in the HB Line Facility.…