Bonneville Power Administration (BPA) proposes to correct an impairment to the Driscoll-Astoria transmission line near structure 19/3. The ground t…
Secondary Road Maintenance activity. Replace failed 36" corrugated galvanized metal pipe with new 60" HP pipe. This activity will occur in Tims B…
This proposed activity entails having a roofing contractor perform concrete core drilling on the roof of H Canyon.…
The Western Area Power Administration (WAPA) is proposing to dispose of out-of-service equipment at various WAPA facilities throughout Arizona. The…
Replace caulking around all exterior windows, repair damaged sheetrock and repaint walls in offices 7, 9, 59, and 60 in Building 707-F.…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
Warranty repair work on 902-4B Fire Water tank includes draining the tank, sanding interior seams of tank, then applying Epoxy to sanded areas. Rep…
The once-thru AHU and exhaust system for the Inert Loading Facility (rooms 324 and 325) shall be replaced with a system that is more reliable and m…
The proposed activity is to allow discharge of non-process HVAC chill water to the stormwater ditch that goes to the constructed treatment wetland …
Remove remaining floor tile from RBOF (Receiving Basin for Off-site Fuel) facility. Scope of work includes removing floor tiles, removing tile mast…