Room 169 is being modified to accommodate office spaces throughout the room, resulting in deficient notification device coverage as required byNFPA…
Replace the packing in Return Pump #3 at 281-2H.…
Install backboards in phone room in 722-A.…
Augusta Industrial to pressure wash internal cooling tower basins at 785-1B and 785-A.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Casper-Glendo No…
Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…
Relocating steam heater and associated electrical and piping per DCF.…
Evaluate and repair crane solenoid and breaker that is intermittenly tripping on low lift crane at 681-3G.…
Replace Valves SCW-V-4501 and 4500 at K-Area Assembly Area, and associated insulation.…
The Bonneville Power Administration (BPA) is proposing to replace insulators, improve/reconstruct access roads, and install fall protection along t…