905-100F Remove suspect asbestos gasket material for repair of hole in pump piping at bottom left of Valve 19.…
Subcontractor will provide roof repairs at Building 731-3N. The Subcontractor will not disturb the existing roof while performing these repairs on …
Inspection and/or repairs to currently installed Main Feeder 13.8kva utility poles in and between C, N, and General Technical Areas.…
Inspection and/or repairs to currently installed Main Feeder utility poles within A and SRNL Technical Areas.…
Inspection and treatment of utility/power poles in the H Area (Canyon, HTF, General, ETF).…
Evaluate and repair roof leak over Rooms 231 and 240 in Building 703-41A. The subcontractor will not disturb the existing roof while performing the…
This proposed activity will remove floor tiles and rotted cabinets in 705-H room 46. Floor tile removal will be worked as an asbestos task. New low…
Remove and replace insulation around the following Inlet Valve CCL-04 (WO# 01701925), Valve - Header Blowdown to Sump (WO# 01708340), and around a…
Remove 3 heating, ventilation, air conditioning units and replace with 3 new heating, ventilation, air conditioning units. The units are located on…
The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine communication system activities at existing facilities …