Boiler preventive and corrective maintenance (PM/CM) on 735-1B Hot Water System, including removal of presumed asbestos containing material (PACM) …
The existing cubicles are original to the 730-B facility and have reached the end of their design life and will be replaced.…
Remove insulation from valve 806, so that packing can be adjusted. Valve is located in front of 736-A, SRNL.…
Replace wooden steam line support brackets with steel brackets in various locations in A-Area.…
Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
The proposed action is to fully remove the existing roof system on building 292-F, Fan House, down to the existing metal deck and replace it. …
Reroute Domestic Water underground piping around Trailers 704-62S and 704-63S.…
In 108-1L, remove existing instrument air piping valves V-563, V-564, and V-565. Fabricate, hydro test, in-service leak test & install new spool p…
Subcontractor will provide roof repairs at Building 246-2H. The Subcontractor will disturb the existing roof while performing these repairs.…
Replace Valves V-36, V-152, V-87 and V-406 on Steam System. Valves V-36, V-87, and V-406 will also include replacement of presumed asbestos contai…