Prep and paint pump skid at Waste Solidification Building (WSB).…
Bonneville Power Administration (BPA) is proposing to resurface the bridge crossing of Butte Creek, which leads to BPA’s Raymond Substation. The br…
Replace the tile and carpet in the 105-K Personnel Wing Ladies Restroom and Locker Room.…
Work will include replacing some ceiling tiles, fixing holes in walls, painting walls and doors, and fixing/repairing the cove base. No asbestos c…
Replace all exterior light fixtures on 233-23H and 233-24H with LEDs.…
SUD/Construction to paint air release valves on the river water system. Scopes include cleaning, prepping, and painting.…
SUD to paint various equipment sitewide. Scopes include cleaning, prepping and painting. …
Paint Rooms 243, 244, 334, 336, and 337. Replace carpet in Room 243. Activities will occur in Building 730-B.…
BPA proposes to replace 16 structures and improve access roads on the Fairview-Bandon No. 1, Reedsport-Fairview No. 1, Tahkenitch-Reedsport No. 1, …
Services of a Texas licensed and certified Herbicide / Sterilant Application Vendor to provide all chemicals, transportation, equipment, tools, ves…