Removal of presumed asbestos containing material (PACM) gasket material at 784-7A Steam Plant in various flanged connections to allow for maintenan…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace the existing roof on the Machine Shop at the Montrose Po…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to remove several trees and shrubs around its Poudre Substation (PD…
Refurbish F-Area entrance signs.…
Install additional insulation in exterior wall and miscellaneous voids. Maximum wall insulation coverage area is anticipated to not exceed 1,000 sq…
607-70G Remove insulation from process water line in Ditch 1.…
Remove, replace, reinstall MST-TRP-001 (steam trap) associated piping, insulation (non-asbestos), and potentially asbestos containing material (PAC…
Remove two presumed asbestos containing material (PACM) gaskets from Recovery Well 8 to allow for routine maintenance.…
This proposed activity will remove additional insulation from the 150 pound steam to trap to allow for leak repairs.…
This proposed activity will regasket a drop jumper in the Canyon Building. The gasket is assumed to be asbestos containing material.…