Remove damaged section of non-asbestos insulation and jacketing from abandoned steam line south of 285-H. Remaining insulation and jacketing will b…
Provide and install all materials and wiring necessary for the installation of a new fiber optic cable between 719-5N and the new PECMC yard office…
Troubleshoot and repair Heating Water Circulating Pump #005 in Building 735-1B.…
Remove domestic water valve H-234000-DW-V-80.088 from the domestic water system by cutting brass nipples as needed per M-DCF-H-13606. Relocate stra…
Replace carpet in Building 703-A.…
Services of contractor to furnish all materials and labor necessary to remediate mold at Big Hills’s Crude Oil Lab and Warehouse. The contractor sh…
Perform repairs to the interior of Building 705-N.…
Bonneville Power Administration (BPA) proposes to replace deteriorating wood-pole structures (including, cross arms, insulators, guy anchors, etc.)…
This task will remove and replace asbestos tile, cabinets, and ice machine. Construction personnel will also paint and repair walls in Building 703…
706-6F Facility Modifications…