BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
Remove and reinstall pressure relief valve SW-PRV-001 at 681-3G Pump House #3.…
Replace carpet in Building 751-1A, Room 17 using standard blue carpet squares.…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
Tile removal and replacement in 105-K Personnel Wing, Room 1013.…
Replace the existing metal halide and fluorescent lights in the K- Area 105-K building with LED Technology.…
Installation of new domestic water piping in J and S-Areas.…
The nature of this modification is to blow out the CW coils in the 234-4H Air Handling Unit (AHU) with air. To do this, each individual coil must b…
Insulation and mastic to be removed from chilled water piping feeding AHU-002 at 702-2A. Section to be removed to allow access to a y-strainer for …
The Department of Energy intends to fund operation and maintenance actions at the Sanford Underground Research Facility (SURF). Actions would be bo…