The Desert Southwest Region (DSW) routinely operates and maintains more than 243 substations, switch-yards, and communication sites. Routine mainte…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Montrose-Hesperu…
Replace discharge check valve on DFP 001 (Diesel Fire Pump) at Building 192-2K. Gaskets are being treated as asbestos material.…
Subcontractor will provide roof replacement at Building 251-H. The Subcontractor “will” disturb the existing roof while performing this replacement…
Sampling and disposition of rainwater intrusion to the C-area Settler Tank.…
This revision adds new poles at CITRC on circuit 54. Poles will be: 54-26A-1, 54-9-4-3 and 54-9-4-4.…
The purpose of this revision is to add the replacement of the TAN-679 roof. The environmental aspects and conditions and instructions remain the sa…
BPA proposes to improve approximately 2.5 miles of existing roads and trails providing access to the Jones Canyon-Santiam No. 1 transmission line i…
BPA proposes to perform replacement of the third wood pole structure and associated structural/electrical components (e.g. cross arms, insulators, …
Bonneville Power Administration (BPA) proposes to repair the metal roof and an exterior vent on the equipment building at the Metaline Radio Statio…