Replace the tile flooring in the 701-1K Vestibule.…
Replace bearings for on chilled water at 285-11F. The presumed asbestos containing material (PACM) gasket material at the flanges will be removed.…
Excavate to correct the domestic water supply line leak at MOX Concrete Batch Plant.…
The planned work scope is for the removal of floor tile and mastic known to contain asbestos in Room 54 of Building 713-N. Dispose of asbestos con…
Subcontractor will provide assembly and disassembly roof repairs at Building 105-L. The subcontractor "will not" disturb the existing roof while p…
Collection and disposal of non-hazardous waste and recyclables.…
Replace packing and unclog drain on cooling water supply pump 004 at 285-H.…
The Process Computer System (PCS) for the Function Test Station (FTS) is beyond its service life and needs to be replaced. Some of the components a…
Repair walls, floor and seal roof of Trailers 735-10 and 735-9. Activities will require removal and replacement of damaged wood paneling, wall ins…
This design change (M-DCF-K-00585) will replace the 216-B sump pump and the associated discharge piping. Due to the existing anchor bolts in the su…