772-F domestic water outlet isolation valve is leaking. In order to repair domestic water line near regulator, the presumed asbestos containing mat…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. The approximate width of the riprap addition i…
This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
BPA is proposing to conduct inspection & repair of transmission tower steel lattice legs and concrete footings at transmission structures of the Ch…
Subcontractor will provide roof repairs to Building 717-2B. The Subcontractor will not disturb the existing roof while performing these repairs on …
Welding repairs on Steam Lines.…
BPA proposes to perform routine maintenance along the access roads and structure spur roads of the Paul-Olympia No. 1 transmission line, between st…
Fabricate and install an aluminum cover over existing well northwest of Trailer 247-19F.…
Construction will take an asbestos sample from electrical enclosures in the 4th Level Control and Hot Gang Valve Corridor…
Remove PACM gasket for hoist motor and repair emergency gate hoist 001 at L-Lake dam.…