Construction personnel will renovate the interior of Building 701-1H.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Curecanti-Crysta…
Remove the end of life asphalt roof shingles, overlay existing wood deck, and install new 35-year asphalt shingles.…
Western Area Power Administration (WAPA) Desert Southwest Region (DSW) proposes to conduct maintenance along the Harcuvar-Little Harquahala and Har…
Re-caulk windows at the southeast and northeast corners of 730-B.…
Site construction will clean the floor at Building 731-6N of bird droppings using a clorox bleach solution.…
Remove designated areas of crusher run and replace with asphalt.…
Repair chill water leak in Air Handling Unit number 4.…
Replace carpet, floor covering, and cove base in Building 707-F.…
Replace 16 1000W HID lighting fixtures in 717-F Jumper Shop bay with a comparable LED type, Lithonia Model number JHBL 45000LM ACL WDMVOLT GZ10 40K…