Subcontractor will provide roof repairs at Building 716-4A.…
Inspection and treatment of wood utility and power poles along Burma Road, including ACP, Waste Water Treatment, and other G-Area facilities.…
Construction personnel will repair floors, walls, and ceilings on the 4th Level of H Canyon as specified in the referenced work order.…
Inspection and treatment of approximately 414 wooden street and fence Poles in K-Area.…
The proposed activity is to replace the roofing systems over 773-A, E-004, 008, 131 and conduct warranty repairs as needed.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Kiowa Creek-Fort…
Install Universal Wiring, UW, in Building 703-47A.…
Construction personnel will seal asbestos insulation on the duct located in the closet of Room 125 - Building 704-H.…
Inspection and treatment of wood 13.8kva Feeder power poles in L-Area.…
Overhaul of Shone Ejector number 2 located at 607-2A.…